SKY Mall Phase A & B
Project Name
Sky Mall
Consultant
Better Home
Client
Amoon
Contractor
Smart Power
Scope
Mechanical, Electrical, and Plumbing
MidTown Condo
Project Name : MidTown Condo
Client : Amoon
Contractor : Smart Power
Consultant : Better Home
Scope : Infrastructure
Mansoura 6
Project Name : Mansoura 6
Client : (GIS)
Contractors :
-
Smart Power
-
Concord
Consultant : Sabbour Consulting
Scope : Infrastructure
Mansoura 6 - Buildings
Project Name : Mansoura 6
Client : (GIS)
Contractor : Abnaa Sinai
Consultant : Sabbour Consulting
Scope : Infrastructure
Hall of Life - New Capital
Project Name: Hall of Life
Client : (GIS)
Contractor : Concord
Consultant : Shaker Consultancy Group
Scope : Mechanical, Electrical, and Plumbing
Cairo Airport Terminal 2 Travelator
Project Name: Cairo Airport Terminal 2
Client : Cairo Airport Company
Contractor : Hassan Allam Construction
Consultant : Power Generation Engineering & Service Co.
Scope : Mechanical, Electrical, and Plumbing
Porto New Cairo
Project Name: Porto New Cairo
Owner: Amer Group
Contractor: Smart Power
Consultant: Integrated Consultant Group (ICG)
Project Management Company: Projacs
Hyde Park
Project Name
Hyde Park
Consultant
Engineering Consultants Group (ECG)
Client
Hyde Park Development
Contractor
Smart Power
Scope
Infrastructure
Porto October Phase B
Project Name: Porto October Phase B
Owner: Amer Group
Contractor: Smart Power
Consultant: Engineering Consultants Group (ECG)
Project Management Company: ECG
Porto Sharm
Project Name: Porto Sharm Hotel & Resort Infrastructure Phase A & B
Owner: Amer Group
Contractor: Smart Power
Consultant: Engineering Consultants Group [ECG]
Project Description: Consists of two phases (A and B), each with mechanical and electrical work.
City Stars Landscape External Roads
Project Name : City Stars Landscape External Roads
Owner : Land Master
Consultants :
-
Shaker Consultancy Group
-
Engineering Consultants Group (ECG)
Contractor : Smart Power
Golden Coast Sharm El-Sheikh - Staff Accomodation
Owner: Golden Coast for Resorts & Entertaining
Consultant: Shaker Consultancy Group
Contractor: Smart Power
Project Description: Consists of electrical work with power and light current.
City Stars Sharm EL Sheikh Resort Infrastructure
Consultant: Shaker Consultancy Group
Contractor: Smart Power
Project Description: Consists of Electrical,
Telecom-Civil Work.
Flex Film
Owner: Flex Film
Consultant: Flex Film Technical office.
Client: P.E.S
Smart Power Scope: Supply, install and supervision of commission and start up of 5 main distribution panels (3200 A) and MCC’s.
Alex Sugar Factory
Owner: Alexandria sugar.
Client: ABB Auto motion.
Smart Power Scope: Supply, install and supervision of commission and start up of MCC Panels and drives for Alexandria Sugar.
Mobilization of DAMAC Sales Center
Owner: DAMAC
Contractor: Smart Power
Project Description: Supply and installation of network
Smart Power Scope: Supply and Installation of the Power station
Scope Details:
- Installation testing and commissioning of two generators (500 KVA)
- Supply, Installation, testing and commissioning of ATS
- Supply, Installation, testing and commissioning of low voltage distribution switchboards
- Supply and installation of low voltage cables complete with cable trays
- Supply, Installation, testing and commissioning of earthing system
Upgrading of EL-Fayhaa Factory 10th of Ramadan
Owner: EI-Fayhaa Group
Contractor: Smart Power
Project Description: Supply and installation of main substation consists of medium voltage switchgear, LV switchboards
Smart Power Scope: Supply and Installation of the Power Station
Scope Details:
Supply and Installation of medium voltage switchgear
Supply and installation of two low voltage distribution switchboards
Supply and installation of medium voltage cables
Supply and installation of low voltage cables complete with cable trays
Upgrading of Orange – EL Sawah Building
Owner: Orange
Main Contractor: Mobiserve
Project Description: Supply and installation of main substation consists of RMU, Transformer and LV switchboards for upgrading the total power to be 1.5 MVA
Smart Power Scope: Supply and Installation of the Power station
Scope Details:
Supply and Installation one 1.5 MVA transformers
Supply and Installation one RMU
Supply and installation of low voltage distribution switchboards
Supply and installation of low voltage cables complete with cable trays
Uptown Cairo Residential
Owner: Emaar Misr
Contractor: Smart Power
Project Description: Supply and installation of the electric power
Smart Power Scope: Supply and Installation of the outdoor system for measuring the medium tension outside the building including the supply of cables, connections, termination points and civil works.
Scope Details:
Supply and Installation of outdoor medium voltage switchboard.
Supply and Installation of medium voltage cables.
Vodafone – Beni Suef Building
Owner: Vodafone
Main Contractor: DETAC company
Project Description: Supply and installation of the Electric Power Station
Smart Power Scope: Supply and Installation of the Power station
Scope Details:
Supply and Installation of medium voltage switchboard consists of six cubicles
Supply and Installation of 2 RMU
Supply and Installation of medium voltage cables
Supply and Installation of 2 dry type transformers
Supply and Installation of Bus duct several ratings
Supply and Installation of low voltage distribution switchboards
Supply and Installation of low voltage cables
Supply and Installation of three low voltage power factor correction switchboards
Moulinex Factory
Owner: Multi Trade Egypt
Contractor: Smart Power
Project Description: Power Station for the factory
Smart Power Scope: Supply and installation of the Power station and electrical distribution rooms of the project.
Supply and installation transformers
Supply and installation of medium voltage switchboard
Supply and installation of medium voltage cables
Supply and installation of low voltage switchboards
Supply and Installation of low voltage cables
Supply and installation of cable trays
Supply and installation of earthing system
A3mal Channel
Owner: A3mal channel
Contractor: Smart Power
Project Description: Design, supply and installation of main and emergency networks
Scope Details:
Supply and installation of low voltage switchboards
Supply and installation of low voltage cables
Supply and of installation diesel generator 25oKVA
Supply and installation of 2 UPS 6OKVA in parallel operation
AL Rafidain Channel
Owner: EI-Rafidain channel
Contractor: Smart Power
Project Description: Design, supply and installation of main and emergency networks
Scope Details:
Supply and installation of low voltage switchboards
Supply and installation of low voltage cables
Supply and installation of UPS 2oKVA
EL-Sa3a Channel
Owner: Arab company for media broadcast
Contractor: Smart Power
Project Description: Design, supply and installation of main and emergency networks
Scope Details:
Supply and installation of low voltage switchboards
Supply and installation of low voltage cables
Supply and of installation diesel generator 17OKVA
Supply and installation of 2 UPS 6oKVA and 4oKVA
OTV Channel
Owner: OTV channel
Contractor: Smart Power
Project Description: Design, supply and installation of main and emergency electrical network.
Scope Details:
Supply and installation of low voltage switchboards
Supply and installation of low voltage cables
Supply and of installation diesel generator 4OOKVA
Supply and installation of 2 UPS 6oKVA
EL Moltaka EL Araby District
Owner: Almaza — Co.
Main Contractor: Tada contracting company
Smart Power Scope: Installation of the Power station and electrical distribution rooms of the project.
Scope Details: –
Installation of medium voltage switchboard consists of 14 cubicles
Installation of 10 RMU
Installation of medium voltage cables
Installation of 10 transformers
Installation of 10 low voltage distribution switchboards
Installation of low voltage cables
Supply and installation of earthing system.
Air Defense House (Dar Al Defaa Al Gawy)
Owner: Ministry of Interior
Main Contractor: Delta contracting company
Project Description: The project is a private club for Police including two hotels.
Smart Power Scope: Installation of a Power station.
Scope Details: –The installation of a medium-voltage switchboard consists of seven cubicles.
Installation of two RMU
Installation of medium-voltage cables
Installation of three transformers (2 * 1.5 MVA + 1 * 1 MVA).
Installation of Bus Duct 3200 A
Installation of Bus Duct 2000 A
Installation of three low-voltage distribution switchboards consisting of 24 panels
Installation of low-voltage cables
Installation of three low-voltage power factor correction switchboards
InterCairo Factory
Owner: Inter Cairo factory for Aluminum productions
Main Contractor: EGETRA
Project Description: Supply and installation for the factory power station
Smart Power Scope: Supply and installation of The Power Station
Scope Details: –
Supply and installation of medium voltage switchboard consists of eight cubicles
Supply and installation of 2 RIVIU
Supply and installation of medium voltage cables
Supply and installation of four transformers (2 MVA).
Supply and installation of four low voltage distribution switchboards
Supply and installation of low voltage cables
Supply and installation of low voltage power factor correction switchboards
Supply and installation of internal and external lighting systems.
Commissioning and start up for the whole project.
HSBC Headquarter - EL Maadi
Owner: HSBC Bank
Main Contractor: ABB
Project Description: Installation of the main substation consists of transformers, MV switchboards, RMU, LV switchboards, and cables.
Smart Power Scope: Installation of the power station
Scope Details: –
Installation of medium voltage switchboard consists of 8 cubicles
Installation of 2 RMU
Installation of medium voltage cables
Installation of 4 transformers (1.5 MVA)
Commissioning and start up for the whole project.
Upgrading of PT6 Substation at Damietta Sea Port
Owner: Damietta sea port
Main Contractor: Delta contracting company
Smart Power Scope: Supply and Installation of Power Station
Scope Details:
Dismantling the old MV switchboard
The supply and installation of a new medium-voltage switchboard consist of seven cubicles.
Supply, installation, and termination of medium-voltage cables
Commissioning and start-up of the new system.
Royal City
Owner: 6th of October to reclaim land & real estate development co.
Main Contractor: Techno power company
Smart Power Scope: Installation of medium-voltage, low-voltage, and lighting networks, and supply and installation of telephone networks.
Uptown Cairo
Owner : Emaar
Project Manager : Turner
Project Consultant : Smart Group
Main Contractor : Smart Power
Project Description :
Design, procurement, construction, testing, commission and start up of all
components and equipment required for the power supply of phase I, Package
PKG# 18A which include but not limited to transformers rooms.
-
Design of the various elements of the required works including the
architectural, structural, electrical and ventilation for electricity room
building and MV cable network ( cable routes, MV switchgears, transformers
and transformer kiosks….etc.) -
Procurement of the project different elements ( cables, MV switchgears,
transformers and transformer kiosks….etc) -
Execution of all the project elements ( electricity room building, cable routes,
MV switchgears, transformers and transformer kiosks….etc.) -
Testing , commissioning & Start Up
-
Coordinate with all other contractors and consultants working on site.
Holiday Beach Resort
Owner: International touristic development co.
Contractor: Smart Power
Smart Power Scope: Supply and Installation of the medium voltage, low voltage and lighting networks
AL-Watania Poultry
Owner: AI-Wataniya Poultry Co.
Contractor: Smart Power
Location: Wadi El Natron.
Smart Power Scope: Supply, installation, testing, and commissioning of the medium voltage, low voltage, and lighting networks.
Owner: National Holding Company for Poultry
Contractor: Smart Power
Location: 6th October
Project Description: Electrical works for the administration buildings (HeadQuarters).
Smart Power Scope: Supply, Installation, testing and commissioning of electrical works
Owner: AI-Wataniya Poultry Co.
Contractor: Smart Power
Location: Wadi EI Natron
Project Description: Electrical works for two administration and workshop buildings.
Smart Power Scope: Supply, installation, testing, and commissioning of electrical works